Removal 1. Disconnect the vapor hose (A). 2. Remove the rubber pad (B), and then remove the PCV valve. Inspection 1. Insert a thin stick (A) into the PCV valve (B) of the threaded side to check that the plunger moves.
Schematic Diagram
Removal 1. Disconnect the negative (-) battery terminal. 2. Remove the glove box housing (A). (Refer to Body - "Glove Box") 3. Remove the PGS unit (A) after loosening the nuts. Installation 1. Install the PGS unit. 2. Install the glove box housing.
Component Location Components (1) 1. Shower duct (Left)2. Mode actuator (LH)3. Temperature control actuator (LH)4. Temperature door lever (Left)5. Mode actuator (A)6. Console temperature actuator (A)7. Console mode actuator ON/OFF8. Heater case (Left)9.