| Inspection |
| 1. |
Turn the ignition switch OFF and disconnect the battery negative (-) cable. |
| 2. |
Disconnect the fuel pressure regulator valve connector. |
| 3. |
Measure resistance between the fuel pressure regulator valve terminals 1 and 2. |
| 4. |
Check that the resistance is within the specification.
Circuit Diagram Description Canister Close Valve (CCV) is installed on the canister ventilation line. It seals evaporative emission control system by shutting the canister from the atmosphere when leakage detecting system operates. Other information:Hyundai Genesis (DH) 2013-2016 Service Manual: SpecificationsS Hyundai Genesis (DH) 2013-2016 Service Manual: Blower Motor Repair proceduresInspection 1. Connect the battery voltage and check the blower motor rotation. 2. If the blower motor does not operate well, replace it with a genuine blower motor check for proper operation. 3. Replace the blower motor if it is proved that there is a problem with it. Categories
Copyright В© 2026 www.hgenesisdh.com - 0.0238
|